Rev 51360 | Blame | Compare with Previous | Last modification | View Log | Download | RSS feed
% File src/library/base/man/seq.POSIXt.Rd% Part of the R package, http://www.R-project.org% Copyright 1995-2010 R Core Development Team% Distributed under GPL 2 or later\name{seq.POSIXt}\alias{seq.POSIXt}\title{Generate Regular Sequences of Times}\description{The method for \code{\link{seq}} for date-time classes.}\usage{\method{seq}{POSIXt}(from, to, by, length.out = NULL, along.with = NULL, \dots)}\arguments{\item{from}{starting date. Required.}\item{to}{end date. Optional.}\item{by}{increment of the sequence. Optional. See \sQuote{Details}.}\item{length.out}{integer, optional. desired length of the sequence.}\item{along.with}{take the length from the length of this argument.}\item{\dots}{arguments passed to or from other methods.}}\details{\code{by} can be specified in several ways.\itemize{\item A number, taken to be in seconds.\item A object of class \code{\link{difftime}}\item A character string, containing one of \code{"sec"},\code{"min"}, \code{"hour"}, \code{"day"}, \code{"DSTday"},\code{"week"}, \code{"month"} or \code{"year"}. This can optionally bepreceded by a (positive or negative) integer and a space,or followed by \code{"s"}.}The difference between \code{"day"} and \code{"DSTday"} is that theformer ignores changes to/from daylight savings time and the latter takesthe same clock time each day. (\code{"week"} ignores DST (it is aperiod of 144 hours), but \code{"7 DSTdays"}) can be used as analternative. \code{"month"} and \code{"year"} allow for DST.)The \link{timezone} of the result is taken from \code{from}: rememberthat GMT means UTC (and not the timezone of Greenwich, England) and sodoes not have daylight savings time.Using \code{"month"} first advances the month without changing theday: if this results in an invalid day of the month, it is countedforward into the next month: see the examples.}\value{A vector of class \code{"POSIXct"}.}\seealso{\code{\link{DateTimeClasses}}}\examples{## first days of yearsseq(ISOdate(1910,1,1), ISOdate(1999,1,1), "years")## by monthseq(ISOdate(2000,1,1), by = "month", length.out = 12)seq(ISOdate(2000,1,31), by = "month", length.out = 4)## quartersseq(ISOdate(1990,1,1), ISOdate(2000,1,1), by = "3 months")## days vs DSTdays: use c() to lose the timezone.seq(c(ISOdate(2000,3,20)), by = "day", length.out = 10)seq(c(ISOdate(2000,3,20)), by = "DSTday", length.out = 10)seq(c(ISOdate(2000,3,20)), by = "7 DSTdays", length.out = 4)}\keyword{manip}\keyword{chron}